portfolio_page-template-default,single,single-portfolio_page,postid-95,bridge-core-2.0.7,ehf-template-bridge,ehf-stylesheet-bridge,ajax_fade,page_not_loaded,,qode_grid_1400,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-19.4,qode-theme-bridge,qode_advanced_footer_responsive_1000,qode_header_in_grid,wpb-js-composer js-comp-ver-6.1,vc_responsive,elementor-default,elementor-kit-592
 

Griffith University

Griffith University

Project Scope:

  • Civil Works
    • Bulk Earthworks & Detail Excavation
    • Piling, Shoring, Shotcreting
    • Stormwater
    • Pavement & Kerb Reinstatement

Infrastructure:

  • Pipeline installations
    • Electrical & Communications
    • Water Services (Potable Water, Fire Main, Chilled Water)

Project Highlights

Installation footprint:

  • 420 metres total Infrastructure Corridor installed (Electrical, Communications, Potable Water, Fire Main)
  • 315 metres total Chilled Water pipeline installed (500mm+ diameter pipe)
  • 215 metres total Stormwater pipeline installed
  • 18 new Stormwater structures installed
  • 43 new service pits installed
  • 1600 m2 of asphalt pavement reinstated following pipeline installations

CLIENT

CPB

INDUSTRY

Building & Construction

LOCATION

Cnr West Creek Rd & Ring Rd
Nathan, QLD 4111

TIMELINE

May 2018 - Sep 2019